At the RCC, the equipment to be deinstalled and installed includes:
1. Speakers
2. Headsets
3. Handsets
4. USB hubs
5. Cabling for the items above.
6. Connection to the new media docks and jackboxes.
The equipment to be deinstalled and installed at the OCC includes:
1. Shelf unit to hold console
2. Console workstation (W10 MoM)
3. Media Dock
4. ACU unit
5. Jackboxes
6. Cable extenders
7. USB hub x2
8. Cable manager x2
9. Speakers
10. Handset
11. Headset
12. Monitor
13. Ethernet cable from port key through tray and slat wall to console workstation
14. Power cabling from floor through the tray and slat wall to console workstation
Tools required (per Zetron instruction-tools are available on-site):
1. 3/16 - Flathead Screw Driver
2. 3/32 x 1 ½ - Flathead Screw Driver
3. #1 - Philips Screw Driver
4. #0 x 1 ½ - Philips Screw Driver
5. 10 to 18 Gauge – Wire Strippers
6. Small Diagonal Cutters
7. Box Cutter
8. Power Drill (Screwdriver)
9. #2 square bit (Robertson) for Power Drill
The work also includes cable management, asset management, testing of each position and trash cleanup.